Site
1ft Fl. near by exhibition room.
The space provided building materials, which was fitted to
my first idea that I want to play with exiting building materials. Plus, this cctv
camera not only guarded corridor but room behind the door is electricity
control room.
Concept
I LOVE FACULTY // WHAT ABOUT FACULTY ALSO LOVE ME…
Site Analysis
I decided to place the cable man on corridor but when I put real statue
on the site it have to hang on the upper boxes as you see in first picture.
How to make cable man (drawings)
1. 50 of 4 meters cables tied
together.
2. Hang it, and then make its
structure with another line of cable.
3. Weave it together and add more
cable.
4. Making body part. Divided legs
and tie it with more cable.
5. Add his arms. Color it.
SITE+INSTALLATION
ANALYSIS (pre-install)
Drawings are clear and there is a good attempt to represent the physical factors that generate the experience but there could be much more information and accuracy in your drawings (i.e. CCTV camera coverage angles should be precisely represented, as well as human visual angles, and these should be drawn over time, as the viewer approaches the piece.)
ReplyDeleteThe drawings of the construction details should be more accurate (explaining the layer of the cable) and there are no drawings of the attachment system to the site, which I guess it is because those were improvised during installation. All this will be crucial for your future project.
Otherwise, sequential documentation and overall site and installation definition is quite good!