Pichy's installation drawings : Eve and I

Installation site and dimensions






Installation Structure



First, the concrete buckets are placed in position to the markings.


Second, the main pipes are erected as the main structural columns.


Third, all pipes are connected.


Fourth, the lightings are installed both inside and outside, along with the apples and transparent strings.


Fifth, the projectors and speakers are setup.


Sixth, the black curtains are properly attached to the pipes, to ensure no light leaks in.


Seventh, the opening is made in the curtain for viewing.


Exploded view on the installation